Wall painting work will be carried out as scheduled below:
| Work Period | Location |
|---|---|
| 15 May – 18 May 2019 | G/F Lobby and Corridor areas |
| 20 May – 21 May 2019 | L115 near entrance at back staircase L114 near goods lift L114 near Core E exit |
Paint smell may be emitted during the work period.
We apologize for any inconvenience caused.
- Notice
PolyU Library AI Chatbot