For enhancing the study environment, building works will be carried out in Library according to the schedule below:
| Location | Work Description | Work Period | Arrangement |
|---|---|---|---|
| L501 & L401 | Defect rectification |
22 Dec 2018 – 6 Jan 2019 |
|
| G/F car park exit | Car park exit revamp | 25 Dec 2018 – 6 Jan 2019 |
|
| G/F Corridor (outside L004 and L010) |
Flooring rectification | 25 Dec 2018 – 27 Dec 2018 |
|
Library will try shortening the noisy work duration and minimize the disturbance. Sorry for any inconvenience caused. Thank you for your forbearance.
- Notice
PolyU Library AI Chatbot