Partial Closure of Library area for Building Works (Aug – Sep 2017)

For enhancing the study environment, building works will be carried out in Library according to the schedule below:

Location Work Description Work Period Arrangement
4/F Room L404 &
5/F Room L505
Renovation 8 Jun –
15 Sep
  • Noise will be generated
  • L404 and L505 will be closed
3/F Multimedia Commons Lighting replacement works 28 Jul –
2 Sep
  • Multimedia Commons will be partially closed
  • Part of the lighting will be shut down at the work area
  • Noise will be generated
Front Staircase
1/F – P/F
Rubber flooring rectification 1 – 18 Aug
  • The staircase from 1/F – P/F will be closed
  • Users are advised to use back staircase for accessing 1/F to G/F
G/F Collaboration Zone 1 (L019 ) Rain water pipework rectification 1 – 25 Aug
  • L019 will be partially closed
  • Noise will be generated
4/F front staircase and 5/F back staircase Duct work for new air-conditioning system 1 – 19 Aug
  • Female student washroom at 5/F back staircase will be closed
  • Hallways at 4/F Front staircase will be partially closed
4/F back staircase and 5/F front staircase Duct work for new air-conditioning system 13 – 24 Aug
  • Male student washroom at 4/F back staircase will be closed
  • Hallways at 5/F Front staircase will be partially closed

Library will try shortening the noisy work duration and minimize the disturbance. Sorry for any inconvenience caused. Thank you for your forbearance.

  • News